Client
A Europe-based leading cement manufacturer with a large manufacturing capacity, part of the top 3 large cement manufacturing company.
Engineering Requirement
The client aims to utilize lean gas as fuel, requiring a 4.0 km, 8-inch pipeline from the pressure regulating and metering facility to a new distribution station. This gas pipeline detailed engineering project focuses on efficient, reliable natural gas delivery, emphasizing operational sustainability and cost-effectiveness.
Detailed Engineering Of Gas Pipeline Scope: